The challenge
The supplied project photos show the old deck removed before the new frame and deck surface were built beside the existing house and patio.
Scope of work
- Removal of the old deck structure
- New deck framing and joist system
- New wood decking surface
- Steps and transitions to the yard
Constraints
The new work was fitted beside the existing house, patio and landscaping shown in the project photos.
The result
A clean new backyard deck with consistent board runs, a defined step and a finished transition to the yard.






